What building code does Madison County use?
Madison County uses the 2012 International Building Code when reviewing building plans for commercial and residential projects.
When do I pay for my permit?
You will be required to pay for the permit upon submitting your building permit application.
What forms of payment are accepted?
You may pay with cash (for charges up to $300), check, or a major debit or credit card. Please note that debit and credit card transactions are subject to a service fee administered by GovPayNet.
Do I need a building permit to install windows?
No, a building permit is not required to replace existing windows. However, if an existing window is being replaced with a larger window or if a new window is being installed, a building permit is required.
Do I need a permit to replace siding?
No, a building permit is not required to repair or replace siding
Do I need a permit to remodel my kitchen and/or bathroom?
Unless you alter the rough plumbing, remove a load-bearing wall, upgrade the electrical service, pull the electrical meter, or add square footage to the home, a building permit is not required.
How do I determine a property's zoning classification?
In order to determine a property’s zoning classification, you must contact the Planning and Development Department at (618)296-4468.
When may I begin work on my project?
You may begin work on your project once the application is approved by the Building Inspector and you receive your Madison County building permit.
How long is my building permit active?
A building permit is active for one (1) year from the date it is issued. If your permit is expired, please contact the Planning and Development Department at (618) 296-4468 to request a permit review and renewal.
How do I contact the inspector?
You may contact your inspector by calling our office at (618) 296-4468. Please be prepared to provide your building permit number. If you are calling prior to 9:00 AM to schedule an inspection, this will typically ensure same-day inspection.
May I live in my home during a repair, remodel, or alteration?
Yes, provided it was previously approved for occupancy as a dwelling.
When do I need a demolition permit?
A demolition permit is required for all structures demolished and/or removed from their present location. A final inspection is required upon completion of the project and landfill receipts are mandatory for all waste removed from the site for disposal purposes.
How long is a demolition permit active?
A demolition permit is active for six (6) months from the date it is issued.