Yes, you must be issued a building permit prior to installing a modular home. Please note that the modular home you choose must be on the State of Illinois’ approved modular buildings list and meet all building code specifications.
A modular home permit is subject to the following fees:
• $0.15 per square foot (based on total square footage, not living space)
• $50 Electrical Fee
• $60 Plumbing Fee
• $200-$250 Sewage Disposal System Fee (if applicable)
• $30 Certificate of Occupancy Fee
Yes, you must be issued an installation permit prior to installing a manufactured home. Please note that unless you locate your manufactured home in an approved manufactured home park, you must first be issued a Special Use Permit allowing the manufactured home to be installed at the property. To determine whether the mobile home park in which you are interested is approved to accept additional manufactured homes, inquire with the Zoning Administrator at (618) 296-4468 or via email at zoning@co.madison.il.us.
A manufactured home permit is subject to the following fees:
• $0.15 per square foot (based on total square footage, not living space)
• $50 Electrical Fee
• $200-$250 Sewage Disposal System Fee (if applicable)
• $30 Certificate of Occupancy Fee